Skip to content
B-CIJVAL Engineering Services Ltd

Project Case Study

Road Construction and Drainage Works, Sokoto

Road construction through a built-up area, from site clearance and subgrade preparation to final surfacing and lane marking.

Location
Sokoto, Nigeria
Project Type
Road Infrastructure

Project Overview

What this project is

The project involved the construction and development of road infrastructure in Sokoto, Nigeria, including site clearance, earthworks, subgrade preparation, and the construction of sub-base and base course layers. Drainage systems were also constructed to provide effective stormwater management and protect the road pavement.

The works progressed through priming and road surface preparation, final surfacing, and lane marking to deliver a completed and functional roadway. The project was completed in 2025, providing improved road connectivity, drainage, and all-weather accessibility within the project area.

Project Gallery

Photographed on site

Site photography from the B-CIJVAL project record.
The completed road through the settlement, edge line and centre marking applied and the side drain cut in along the right shoulder
The completed road through the settlement, edge line and centre marking applied and the side drain cut in along the right shoulder
A surfaced section with centre line marking and the drainage channel formed along the left edge
A surfaced section with centre line marking and the drainage channel formed along the left edge

Related Projects

Similar work

Planning something similar?

Send us the site and the problem. We will tell you what investigation it needs before anyone talks about cost.